My dealer has ordered a new hot coolant transfer pump for my Prius (@ 31,300 kms). This will be the first time their Prius tech will be installing one, and the service manager is unsure how long the job actually will take (he's talking about possibly needing to have the car for a day or two). If you've had the pump replaced, roughly how long did it take?